Keeping our kids and employees safe provides a great learning environment and peace of mind. An identified priority in the Nov. 2019 bond request is safety and security upgrades at all district buildings. Project estimates for each site are below, totaling $4.2 million.

Each school will be retro-fitted with a double door entry system, cameras, fencing and other systems as appropriate to control access to schools. Contractors, security consultants and staff members from each school will contribute to determining how best to keep everyone safe.

The photo above is a double door entry way system used in Cowlitz and Clark county schools to allow school personnel to control access to the school.

Additional fencing
Secure entrance

Secure entrance – additional fencing at entrance
Access controls
Exterior lighting
Cameras
Intercom system improvements
Perimeter fencing- to be completed in 2019

Secure entrance
Access controls
More cameras
Intercom system

Secure entrance
Emergency exit doors

Fencing/gates to enclose playground
More cameras
Partial wall to enclose library
Gate in entry to auditorium

Access controls
Additional video surveillance and handheld communications devices

Allowance for temporary improvements

Secure entrance
Additional and new cameras

Secure entrance

Allowance for temporary improvements

Intercom speakers for main building, hallway, outside, office paper room, workroom
Lockdown button for main doors (secure entrance)
Secure entrance to control access to the main hallway
Building control access from Monticello Field
Reconfigure porch to control access to students during dismissal
Remove east wall
Build wall at existing steps to funnel student to the fence and gate
General fencing improvements

Access controls
Additional video surveillance and handheld communications devices
Secure entry

Secure entrance

Secure entrance
Additional video surveillance

Secure entrance
Access controls

Secure entrance
Access controls

Notification system
Exterior door replacement allowance – Phase I of long term replacement plan

Read more about capital bond projects here.

Read more about the bond planning process here.