sample elementary school rendering

Example illustration, not actual rendering.

Replacement of Northlake Elementary School is estimated to be $45.2 million. This includes:

  • Complete replacement of existing school.
  • Expand capacity to serve 540 students; Northlake currently serves 330 students.
    • Incorporate the state mandated special education preschool program into the design to serve 100 students at a time.
    • Students on the east side of Longview would be able to attend school closer to their own neighborhoods
  • Modern safety and security features built into the design.
  • New technology built into the classrooms/building.
  • Eliminate the use of portables.

Read more about capital bond projects here.

Read more about the bond planning process here.